The plan
A Vision This Important Deserves a Plan Just as Bold.
Land has been secured. The community foundation has been built. Now begins the careful work of transforming a shared vision into a lasting home for generations.
Current Stage: Community Vision, Planning and Development
Current status
Where Things Stand
Two stages are complete: the Society was formed with a board and community membership, and land was acquired in Abbotsford. The project is now in Stage 3 — retaining qualified consultants and carrying out the studies and planning work that later approvals depend on.
No government funding has been approved, no design has been finalised, and no construction date exists. Each remaining stage depends on the one before it.
Conceptual image — landscape placeholder, not the Society’s property. Replace with approved project photography.
Stage 1
Completed
Community Foundation
Forming the Society and confirming the community need.
- Establish the nonprofit society
- Form the board of directors
- Engage community members
- Identify the need for culturally responsive long-term care
Stage 2
Completed
Land Acquisition
Securing a suitable property in Abbotsford.
- Purchase suitable land in Abbotsford
- Confirm preliminary project potential
- Begin early professional consultation
Stage 3
In progress
Professional Consultation
Retaining qualified professionals and advancing planning work.
- Retain qualified consultants
- Conduct studies and site-planning work
- Develop preliminary operating and facility requirements
Stage 4
Future stage
Government and Financing
Exploring public financing pathways. No funding has been approved.
- Communicate with provincial and federal government bodies
- Explore eligible public financing and loan programs
- Work with BC Housing and other applicable bodies where appropriate
- Develop the financial and operating model
Stage 5
Future stage
Design and Approvals
Turning requirements into an approved, licensable design.
- Facility planning and architectural design
- Zoning and municipal processes
- Engineering and technical studies
- Health authority consultation
- Licensing and regulatory approvals
- Building-permit process
Stage 6
Future stage
Construction
Building the home once funding and approvals are in place.
- Conduct a qualified contractor-selection process
- Begin construction after funding and approvals
- Monitor quality, safety, budget, and timelines
Stage 7
Future stage
Operational Readiness
Preparing people, policies and systems before opening.
- Recruit administrative and care staff
- Complete background checks
- Establish clinical and operational policies
- Complete inspections
- Prepare resident and family systems
- Obtain all required operating approvals
Stage 8
Future stage
Future Opening
Welcoming residents once fully licensed and operational.
- Coordinate admissions through applicable health authorities
- Welcome residents when the facility is fully licensed and operational
Timeline note:
The anticipated five-to-seven-year timeframe is an estimate, not a guaranteed opening date.
Transparency
Project and Financial Reporting
The Society publishes progress information as it is confirmed. Figures are never estimated or illustrated.
Major project expenses
To be updated by the Society
Consultants retained
To be updated by the Society
Approvals received
To be updated by the Society
Upcoming milestones
To be updated by the Society
Annual reports
To be updated by the Society
Financial statements
To be updated by the Society
Downloadable reports
Annual reports, financial statements and project summaries will be published here for download as they are approved.
To be updated by the Society
Move the project forward
Progress Will Be Reported Honestly
Professional consultation, community engagement and approvals shape every stage that follows. Updates are published as each milestone is confirmed.